What are the preparations for hotel suite furniture decoration?Hotel suite furniture simply enumerates two key points:one is hardware,the other is software.The subdivisions can be classified into the following points:
1.The layout of water supply and drainage and pipelines is reasonable,which is convenient for the measurement of various areas in the future.The living pool is in line with the five-star hotel,which is convenient for maintenance.
2.The power of the electric transformer is enough,and the power of the air switch of the distribution box is enough,which is convenient for the measurement of various areas in the future,and the layout of the lamps meets the energy-saving requirements in the future.
3.Weak current telephones,reasonable layout of network cable functions,and audio control equipment to meet the needs of meetings and banquets in star-rated hotels.
4.The air-conditioning function layout is reasonable,the noise does not exceed the standard,and the air-conditioning power is sufficient.
5.Fire-fighting functions must be reviewed and determined by local fire-fighting.Fire-prevention zoning,smoke prevention,spraying,smoke detection,etc.must not only meet the specifications,but also meet the decoration effect.
6.The functional layout of the hotel kitchen equipment is based on the number of meals,and the area of the kitchen is determined;the air delivery and exhaust air volume and smoke exhaust noise meet the standards.
7.Bidding by system or type of work.The system is:procurement of exterior walls,water,electricity,weak electricity,fire protection,HVAC,elevators,decoration,kitchen equipment,conference equipment,etc.
8.Handle relevant construction permit procedures for five-star hotels.
1.The layout of water supply and drainage and pipelines is reasonable,which is convenient for the measurement of various areas in the future.The living pool is in line with the five-star hotel,which is convenient for maintenance.
2.The power of the electric transformer is enough,and the power of the air switch of the distribution box is enough,which is convenient for the measurement of various areas in the future,and the layout of the lamps meets the energy-saving requirements in the future.
3.Weak current telephones,reasonable layout of network cable functions,and audio control equipment to meet the needs of meetings and banquets in star-rated hotels.
4.The air-conditioning function layout is reasonable,the noise does not exceed the standard,and the air-conditioning power is sufficient.
5.Fire-fighting functions must be reviewed and determined by local fire-fighting.Fire-prevention zoning,smoke prevention,spraying,smoke detection,etc.must not only meet the specifications,but also meet the decoration effect.
6.The functional layout of the hotel kitchen equipment is based on the number of meals,and the area of the kitchen is determined;the air delivery and exhaust air volume and smoke exhaust noise meet the standards.
7.Bidding by system or type of work.The system is:procurement of exterior walls,water,electricity,weak electricity,fire protection,HVAC,elevators,decoration,kitchen equipment,conference equipment,etc.
8.Handle relevant construction permit procedures for five-star hotels.